The 2-Minute Rule for Contour Survey
It may differ from twenty m to a hundred m. Nearer intervals are necessary if ground level differs abruptly. The cross- sectional line needn't be normally be at correct angles to the main line. This process is Preferably fitted to street and railway jobs. Radial Line StrategyIn meteorology, the barometric pressures proven are decreased to sea level